{"id":1876,"date":"2026-11-12T16:08:48","date_gmt":"2026-11-13T00:08:48","guid":{"rendered":"https:\/\/www.metroabundance.org\/?post_type=legislation&#038;p=1876"},"modified":"2026-11-13T07:06:49","modified_gmt":"2026-11-13T15:06:49","slug":"transportation-scorecard-act","status":"publish","type":"legislation","link":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/","title":{"rendered":"Transportation Project Prioritization Reform"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">About the bill<\/h3>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>\u201cPolitical wish lists of the past are replaced with a data-driven process that is objective and transparent, making the best use of renewed state funding.\u201d<\/p><cite>\u2014 <a href=\"https:\/\/virginiabusiness.com\/byline\/jessica-sabbath\/page\/56\/#:~:text=%E2%80%9CPolitical%20wish%20lists,based%20prioritization%20process.%E2%80%9D\">Terry McAuliffe<\/a>, Virginia Governor (2016)<\/cite><\/blockquote><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">What this bill does<\/h4>\n\n\n\n<p>This bill establishes an objective and transparent cost-benefit process for the state to use to meet the state\u2019s transportation goals. The process ensures that projects are evaluated and selected on the basis of measurable benefits, while maximizing those benefits per dollar spent.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Why it&#8217;s needed<\/h4>\n\n\n\n<p>States have limited resources for transportation infrastructure, but with today\u2019s high costs to build, it is more important than ever to ensure that the best, most useful projects are the ones that receive funding and that the state is responsible with public dollars.&nbsp;<\/p>\n\n\n\n<p>However, because of politics, conflicted regional interests, and even the internal biases within public agencies, worthwhile and cost-effective projects have often languished while expensive but politically expedient projects have advanced. The processes that determine which projects receive funding, or are even considered for funding, are in many cases unclear or fundamentally opaque.<\/p>\n\n\n\n<p>This bill creates a framework that ensures that the political decisions and technical analyses that guide transportation investments are made in a transparent, open way, using a scored, objective process tied to the state\u2019s actual transportation goals.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Frequently asked questions<\/h4>\n\n\n<div class=\"wp-block-faq\">\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tWhat does this bill actually do?\n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p>This bill creates an objective process for the state to select transportation projects. Specifically, it:<\/p>\n<ul>\n<li><strong>Ensures sound, cost-effective investments.<\/strong> By scoring projects according to their benefits versus the size of their requested funding, the state selects the most cost-effective projects to achieve their goals.<\/li>\n<li><strong>Prioritizes getting people where they need to go.<\/strong> Transportation is about getting people and things to places. This bill establishes a model Performance Measure for Access to Destinations to help select for projects that do just that.<\/li>\n<li><strong>Implements process improvements. <\/strong>This bill ensures the Project Selection Process is improving each cycle, with retrospective analyses of its performance, baking in a self-improving feedback loop.<\/li>\n<li><strong>Aligns with local needs.<\/strong> Rural places do not have the same transportation needs that urban places have, and different performance measures may be weighted differently across different types of regions.<\/li>\n<li><strong>Builds up state capacity.<\/strong> Thanks to the transparency created by this process, the teams that submitted projects can go back and see where others did better and learn to build more cost-efficient projects, increasing the average quality of projects throughout the state and its regions.<\/li>\n<li><strong>What gets selected gets built.<\/strong> Cost-conscious planning processes ensure that what gets chosen has enough funding to be built, ensuring that the state\u2019s plans aren\u2019t just a wishlist and that shovels actually hit the ground.<\/li>\n<\/ul>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tHow does transportation planning tend to work now?\n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p>At the end of the day, selecting where transportation dollars are invested is a political process that varies by place. As part of a federally required process, states and regions create long-term, visionary plans, and shorter-term ones with actual projects they choose to invest in. States\u2019 project selection processes can be complex and varied, with the rationale for what gets selected for funding being backed by complicated internal analyses guarded closely by a public agency or just the day\u2019s political whims.<\/p>\n<p>Consequently, the shorter-term investment plans that define what gets built are <a href=\"https:\/\/www.brookings.edu\/articles\/rethinking-us-transportation-policy\/\" target=\"_blank\" rel=\"noopener\">not often aligned with the state or region\u2019s goals<\/a> and vision for their transportation system. In fact, projects included in State Transportation Improvement Programs don\u2019t need an official justification for their inclusion or have a connection to long-range goals. Oftentimes, the analyses leading up to a project\u2019s completion are made moot by political decisions that act as the true deciding factor. As a result, leaders in many states feel as if they are not making progress on goals, despite investment.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tWhere has a Transportation Scorecard been implemented? \n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p><a href=\"https:\/\/www.brookings.edu\/articles\/connecting-the-dots-a-survey-of-state-transportation-planning-investment-and-accountability-practices\/\" rel=\"noopener\" target=\"_blank\">Less than one third of all states<\/a> have a public project selection and prioritization process, but only a handful have advanced processes that use objective and transparent measures. Of the states with project prioritization frameworks, North Carolina, Kentucky, Kansas, Maryland, California, and Utah are noteworthy, but the quality, breadth, and level of influence over what receives funding varies across this group. The majority of states still have no transparent or measured process in selecting transportation projects to be funded. Virginia\u2019s SMART SCALE process is the most mature and directly tied to project selection and should be considered the model to emulate and improve on.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tWho supports a transparent project selection process?\n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p>Because transparent project selection can transcend tough political fights, the strongest project prioritization processes have been supported in both red, blue, and purple states. <a href=\"https:\/\/www.ncleg.gov\/Sessions\/2013\/Bills\/House\/PDF\/H817v0.pdf\" target=\"_blank\" rel=\"noopener\">North Carolina\u2019s HB 817<\/a> passed the House 105-7 and 44-2 in the Senate with broad bipartisan support. <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?141+sum+HB2\" target=\"_blank\" rel=\"noopener\">Virginia\u2019s HB 2<\/a> was championed by the Democratic Governor Terry McAuliffe and Republican Speaker of the House William J. Howell and later passed unanimously by both the Senate and the House.<\/p>\n<p>In Kentucky, the <a href=\"https:\/\/transportation.ky.gov\/SHIFT\/Pages\/default.aspx\" target=\"_blank\" rel=\"noopener\">Strategic Highway Investment Formula for Tomorrow<\/a> (SHIFT) process was developed under former Republican Governor Matt Bevin and has remained in place under Governor Andy Beshear.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tHow well do these processes work?\n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p>While it does depend on how well they are implemented and the buy-in from the DOT, executive, and legislature, strong project prioritization processes generally have an effect of increasing transparency into how investments are made and the rigor of analysis used to determine if they are worthwhile investments. Project prioritization processes also can have major positive implications for cost efficiency. In states that have successfully implemented them, they provide avenues for understanding why their project\u2019s benefits do not outweigh costs, allowing for rescoping in future rounds. <a href=\"https:\/\/ctb.virginia.gov\/media\/ctb\/agendas-and-meeting-minutes\/2026\/03\/pres\/smart-scale-2026-03-17.pdf#page=31\" rel=\"noopener\" target=\"_blank\">Resubmitted projects tend to cost less and accomplish or exceed their original goals<\/a>. Additionally, these processes adopt approaches for re-evaluating benefits of selected projects with cost overruns, avoiding overinvestment in bad projects due to the sunk cost fallacy.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tHow does this affect maintenance priorities?\n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p>When improvement projects are selected using a process like the Transportation Scorecard Act, funding often comes out of a dedicated funding program or set of programs. In times when repair needs exceed funding available in traditional maintenance program sources, keeping capacity projects separated means the state can <a href=\"https:\/\/virginiamercury.com\/2026\/09\/18\/virginia-confronts-1-7-million-shortfall-in-highway-maintenance-funding\/\" rel=\"noopener\" target=\"_blank\">adjust funding to prioritize maintenance<\/a> as needed. When states are hurting for transportation funds, and voters are hesitant to approve new taxes, project prioritization processes, like the Transportation Scorecard Act, could ensure that what new infrastructure is being built is cost-effective and scaled appropriately to the resources the state has today. While some states are struggling to maintain their own infrastructure, splitting off new capacity to a performance-based system allows the state to incorporate other processes for the evaluation of maintenance needs, and scale both maintenance and new capacity appropriately.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<div class=\"acc\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"q\">\n\t\t\t\t\tWhat compromises break this bill\n\t\t\t\t\t<svg width=\"12\" height=\"12\" viewBox=\"0 0 12 12\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M6.64766 11.352H4.41566V6.79196H-0.00034374V4.55996H4.41566V-3.76701e-05H6.64766V4.55996H11.0637V6.79196H6.64766V11.352Z\" fill=\"#5E0000\"\/> <\/svg>\n\t\t\t\t\t<svg width=\"12\" height=\"3\" viewBox=\"0 0 12 3\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"> <path d=\"M12.0002 2.232H0.000187576V-1.66893e-06H12.0002V2.232Z\" fill=\"#5E0000\"\/> <\/svg>\n\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"a\">\n\t\t\t\t\t<div class=\"inside\">\n\t\t\t\t\t\t<p>While this bill, as written, can introduce a durable reform to a state\u2019s approach to projects, it is important to address how states fund projects in a Transportation Scorecard process as much as what projects are funded. In Virginia, the Smart SCALE system revealed, when factoring cost-benefit, that many large, politically significant highway widening projects were not scoring well compared to smaller interventions that were more effective at reducing congestion, like signalization and roundabouts. Some in the legislature didn\u2019t like that, creating the <a href=\"https:\/\/www.vdot.virginia.gov\/media\/vdotvirginiagov\/projects\/how-projects-are-funded\/funding-programs-fact-sheets-2025-updated_acc.pdf#page=7\" rel=\"noopener\" target=\"_blank\">Interstate Operations and Enhancement Program<\/a>, which funds projects based on the intensity of truck traffic on interstates. This effectively sidesteps the prioritization process entirely for both cost efficiency and ability to address problems, regardless of strategy. All funds to enhance and improve the transportation system should flow through a transparent, mode-neutral project prioritization process that accounts for project costs versus their benefits.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n\n<div class=\"wp-block-breaker\"><\/div>\n\n\n<h3 class=\"wp-block-heading\">The Legislation<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Full model legislation text<\/h4>\n\n\n<div class=\"wp-block-bill\">\n\t\n\t\t\t<div class=\"bill-nav\">\n\n\t\t\t\t\t\t\t<div class=\"active\">Clean version<\/div>\n\t\t\t\n\t\t\t\t\t\t\t<div>Annotated<\/div>\n\t\t\t\n\t\t\t\t\t<\/div>\n\t\n\t<div class=\"sections\">\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 1. Title.<\/strong><\/p>\n<p>This Act shall be known and may be cited as the \u201cTransportation Scorecard Act.\u201d<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>Establishes the title of the legislation as the \u201cTransportation Scorecard Act.\u201d<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 2. Purpose and Intent.<\/strong><\/p>\n<p>(a) The Legislature finds that:<br \/>\n(1) the cost to deliver transportation projects has increased significantly over the past decade, eroding the number of projects the state may fund with its existing resources;<br \/>\n(2) revenues from traditional sources of funding have declined, and there is a need for the state to evaluate ways to efficiently use existing funds;<br \/>\n(3) the state has previously funded transportation projects that are poorly aligned with goals of the state and its regions and that improving transparency would greater serve the state; and<br \/>\n(4) with limited resources to achieve state goals, it is in the public interest that a transparent, objective prioritization process be developed and implemented to make progress toward the state\u2019s goals to improve the efficiency and effectiveness of the state&#8217;s transportation system.<br \/>\n(b) The purpose of this Act is to direct the [STATE DOT \/ PROJECT SELECTION ENTITY] to develop a data-informed, objective, transparent, and scored project prioritization system, to be used to select projects funded by the [state] that are included in the [STATE TRANSPORTATION IMPROVEMENT PROGRAM\/STATE 5-YEAR CAPITAL PROGRAM.<br \/>\n(c) This Act is intended to ensure that investments in the state\u2019s transportation system serve the long term goals outlined in [EXISTING LAW], promote cost-efficient investment in infrastructure, and improve outcomes related to the state\u2019s goals outlined in [the LONG RANGE TRANSPORTATION PLAN \/ or outlined in STATE LAW LINKED TO GOALS]:<br \/>\n(1) [the safety of all transportation system users, including pedestrians, motorists, transit users, and bicyclists,<br \/>\n(2) access to convenient and affordable transportation to critical destinations, including schools, jobs, healthcare, and other community needs,<br \/>\n(3) transportation-efficient land use, regional economic development and freight movement,<br \/>\n(4) Fiscal responsibility and the stewardship of assets in a state of good repair, including a financial plan for the maintenance of a proposed project over its service life.]<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section establishes the purpose and intent of the bill and explains why project prioritization reform is worthwhile and needed, highlighting key areas, across infrastructure cost, revenue decline, accountability, and good governance that the bill would improve.<\/p>\n<p>The bill emulates the SMART SCALE process in Virginia, along with some other objective project prioritization processes that exist in states like Utah and Kentucky, to create a flexible multimodal project selection framework that helps select projects based on projected benefits and their costs. The bill also provides a framework for improving the process and has several non-onerous requirements for transparency and capacity-building derived from best practices in the states today. <\/p>\n<p>Finally, this section has an optional component to re-anchor this process against either the state\u2019s long-range transportation plan or the state\u2019s goals, or alternatively, states that the goals of the process are to ensure investments prioritize safety, access to jobs and important destinations, promote efficient economic growth, and are fiscally responsible.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 3. Definitions.<\/strong><\/p>\n<p>For the purposes of this Act:<br \/>\n(a) \u201cAccess\u201d means the quantified ability, in terms of time, proximity, and cost, to reach destinations, including employment, housing, medical care, education, goods, services, and freight facilities.<br \/>\n(b) \u201cCosts to the State\u201d means the total of a project\u2019s estimated costs to State or Proposing Entity, including:<br \/>\n(1) the costs to plan and construct a project,<br \/>\n(2) the anticipated long-term maintenance and operations costs over the course of an asset\u2019s useful life,<br \/>\n(3) [the costs to the public to access and use the project on a daily basis]<br \/>\n(4) [the costs and benefits to public health, derived from quantified air quality and emissions impacts], and<br \/>\n(5) the cost of fatalities and injuries associated with the proposed transportation mode or strategy.<br \/>\n(c) \u201cMajor Surface Transportation Project\u201d means a transportation project for which funds are expended for the construction or reconfiguration of a transportation facility by the [State DOT] or a Proposing Entity the cost of which exceeds $XX million.<br \/>\n(d) \u201cPerformance Measure\u201d means a quantitative, objective, and standardized measurement for the evaluation of transportation projects\u2019 alignment with established goals.<br \/>\n(e) \u201cProject Prioritization Process\u201d means the evaluation, scoring, and selection process established under Section 5.<br \/>\n(f) \u201cProposing Entity\u201d means a government agency, transit agency, or political subdivision that requests that a transportation project be evaluated under the Project Prioritization Process.<br \/>\n(g) \u201c[STATE 5-YEAR CAPITAL PROGRAM]\u201d means the state\u2019s [4-X year] short-range multimodal transportation capital program describing investments across the state.<br \/>\n(h) \u201cState-wide Transportation Improvement Program\u201d means the planning document developed and updated at least every four years by the department in compliance with the requirements of 23 U.S.C. \u00a7 135, listing all transportation projects in the state expected to receive federal funding during the four-year period covered by the program;<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section defines the technical definitions needed for the process to be workable and the types of political entities that would participate in it. <\/p>\n<p>Advocates and legislators must make key decisions in this section.<\/p>\n<ul>\n<li>What is the threshold for applicability and the minimum cost of projects that meet the definition of a Major Surface Transportation Project?<\/li>\n<li>What program of funding does this bill apply to? A specific program of investment in the state, the federally required Statewide Transportation Improvement Program (four-year program of regionally significant and federally funded projects)? <\/li>\n<li>How are costs to the state assessed? Are there existing ways to measure externalities in law that the state should reference? Does your state attempt to mitigate air quality and public health impacts of transportation? Should the state evaluate proposed projects\u2019 costs to drivers to use the facility?<\/li>\n<\/ul>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 4. Applicability.<\/strong><\/p>\n<p>(a) This Act applies to all Major Surface Transportation Projects funded by [STATE DEPARTMENT OF TRANSPORTATION] through the [FUNDING PROGRAM] or included in the [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM].<br \/>\n(b) This act does not apply to:<br \/>\n(1) a project that, on or before [EFFECTIVE DATE], has progressed through [50 percent] completion of the design phase, is subject to a construction agreement or is already included on a fiscally-constrained state or federal capital construction plan.<br \/>\n(2) if authorized by the [Secretary], projects to repair or replace a transportation facility damaged or destroyed by an emergency event described in 23 U.S.C. \u00a7 125(a).<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>Ideally, all projects would have to be evaluated against the merits of all other proposed projects before receiving funding. This section notes that a major consideration is the flexibility of transportation funds in the state. Some states wall off transportation dollars from gas taxes to prevent them from being used for different types of projects. One of the great benefits of this process is the ability to assess the potential costs and benefits of different types of projects, regardless of the mode they use, and also consider improvement projects that affect different types of transportation modes at the same time.<\/p>\n<p>Please see Appendix C for basic language to consider on increasing the flexibility of transportation funds \u2013 be warned, it will likely be a battle. If your state isn\u2019t ready for a major change in funding flexibility, identify what sources of funding are flexible and eligible for multimodal projects and lock that in as the source of funding. In Virginia, where a similar process passed originally, two new programs were created to feed funding into their new project prioritization process. <\/p>\n<p>For the sake of implementation, this bill exempts projects already underway or emergency projects from the prioritization process.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 5. Project Prioritization Process Development.<\/strong><\/p>\n<p>(a) During the initial development of the Project Prioritization Process and in subsequent revisions to the process, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall solicit and incorporate public input to develop methodologies for estimating project costs to the state and Performance Measures, including the measurement of Access.<br \/>\n(b) As part of the Project Prioritization Process, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall adopt Performance Measures to evaluate and score the costs and benefits of projects across all surface transportation modes and strategies.<br \/>\n(1) Performance Measures and all scoring factors and subfactor weights of performance measures adopted by the [STATE DOT \/ PROJECT SELECTION ENTITY] shall correspond with the state\u2019s transportation program goals outlined in [Section 2 \/ Existing Law \/ State Transportation Goals outlined in the Long Range Transportation Program].<br \/>\n(2) A project\u2019s score under the Project Prioritization Process must be based on a project\u2019s projected benefits according to Performance Measures, relative to the project&#8217;s Costs to the State, [which may include projected affordability impacts and costs to users].<br \/>\n(3) The [STATE DOT \/ PROJECT SELECTION ENTITY] may assign alternate scoring weights to categories of Performance Measures within a defined region of the state, based on local needs.<br \/>\n(A) The [STATE DOT \/ PROJECT SELECTION ENTITY] shall not reduce the weight of a Performance Measure to below [10] percent of a project&#8217;s technical score.<br \/>\n(B) Regional weights shall be determined in coordination with Metropolitan Planning Organizations with jurisdiction in the region.<br \/>\n(c) The [state DOT \/ Secretary of Transportation \/ Project Selection Entity] may submit up to [3] projects for evaluation under the Project Prioritization Process and incorporation in the [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM].<br \/>\n(d) Before soliciting proposals for projects, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall publish on its website the guidelines for the Project Prioritization Process, including application instructions and requirements, evaluation criteria, and, if applicable, weighting metrics.<br \/>\n(e) At least once every [two] years, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall review the Project Prioritization Process and update the process and Performance Measures as necessary, while considering recommendations from the analysis referenced in Section 7.<br \/>\n(f) The methodology for all evaluative tools, models, and scoring-related factors used for the Project Prioritization Process shall be made available by the [STATE DOT \/ PROJECT SELECTION ENTITY] in a publicly accessible format on the internet.<br \/>\n(1) The process used to reach a score must be approximated to a publicly accessible scoring formula;<br \/>\n(2) all tools utilized for project selection must be publicly accessible and methods to utilize those tools must be reproducible, with all exceptions and adjustments for model accuracy, including post-processing, clearly notated for each project where exceptions are made; and<br \/>\n(3) when evaluating projects under the Project Prioritization Process, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall not base a score on factors not included in published, accessible material.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section, modeled after the implementation of Virginia\u2019s HB2 (2014) and HB 1884,  outlines the development and execution of the Project Prioritization Process, including how the state would create and adopt performance measures, define what the minimum weights for a measure might be, allow for the creation of regional weights, and, if Appendix A is included, the requirements for an access performance measure. The process should be created and adapted to align with the existing capital program development process in the state. Additionally, this section creates requirements for transparency and accountability within the process. The state will need to publish all material required to conduct the process online, as well as construct and document the process in such a way that it can be summarized to a single scoring formula. This section also connects to the retrospective analysis in Section 7 that will be used to improve the program going forward.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 6. Development of [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM].<\/strong><\/p>\n<p>(a) Projects scored and ranked under the Project Prioritization Process shall be funded and incorporated in the [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM] in accordance with their final scores, except in cases outlined in subsection (c).<br \/>\n(b) Before the publication of the final [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM], the [STATE DOT \/ PROJECT SELECTION ENTITY] shall publish, on an accessible website, the technical score, [any boost points applied and the relevant requesting entity], and the final score and ranking of each evaluated project, the list of projects recommended for funding with the state\u2019s available funds, a map of submitted and scored projects, and a plain-language explanation of technical methodology, and shall accept public comment for at least [45] days.<br \/>\n(c) The [STATE DOT \/ PROJECT SELECTION ENTITY] and the [Secretary] shall have the authority to increase project scores by no more than [25] percent of a project\u2019s total score.<br \/>\n(1) The [Secretary] may adjust the score of projects by half of the total percentage described in section (c) before a project\u2019s incorporation in a draft [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM] only if the [Secretary] publishes a written explanation describing the technical rationale for each modification.<br \/>\n(2) The [STATE DOT \/ PROJECT SELECTION ENTITY] may[, by majority consensus,] increase the score of projects by half of the total percentage described in section (c) before a project\u2019s incorporation in a draft [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM] only if the [STATE DOT \/ PROJECT SELECTION ENTITY] publishes a written explanation describing the technical rationale for each modification as it relates to a deficiency in modeling.<br \/>\n(3) A project recommended by the [Secretary] or  [STATE DOT \/ PROJECT SELECTION ENTITY] with a score insufficient to merit its inclusion in the final [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM] may be incorporated only with a written explanation for the exception and the published signature of the Governor.<br \/>\n(d) Following the official adoption of the final [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ FIVE YEAR PLAN] and end of the Project Prioritization Process cycle, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall publish a list of all submitted projects, including their scores and information submitted to the  [STATE DOT \/ PROJECT SELECTION ENTITY].<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section describes how scored projects from the Project Prioritization Process will be funded and included in state plans for investment. Projects are included in investment plans based on how well they perform and their relative cost-effectiveness, with room for adjustment by the Secretary and the body overseeing the process. The state is required to be transparent in publishing information about the process and allow room for public input. For any time that exceptions are made, a written explanation must be included, and the Governor must sign off on the project. After the process and subsequent adoption of projects into the state\u2019s funding program, the state must publish all scores and information from evaluated projects.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 7. Retrospective Report on Prioritization Process Effectiveness.<\/strong><\/p>\n<p>(a) Following the conclusion of each Project Prioritization Process cycle, the [STATE DOT \/ PROJECT SELECTION ENTITY] shall, in coordination with [STATE UNIVERSITY TRANSPORTATION CENTER] conduct recurring retrospective analyses of the effectiveness of previous Project Prioritization Process Cycles and the state\u2019s previous project selection methodology and develop recommendations for the Project Prioritization Process\u2019s improvement. The analysis may include:<br \/>\n(1) Measurable changes in economic development, transportation-efficient land use, travel behavior, environmental quality, and mode choice, attributable to previously selected Major Surface Transportation Projects and a comparison of projected and observed vehicle miles traveled and travel time reductions for completed transportation projects in the state.<br \/>\n(2) An evaluation of the quantity, location, and type of housing units whose Access to regionally significant economic opportunities was improved or worsened by a Major Surface Transportation Project.<br \/>\n(3) An analysis of savings attributable to the Project Prioritization Process and of planning, staffing, and other project delivery factors affecting the time and costs to complete selected projects to identify future cost savings and Performance Measure modifications.<br \/>\n(4) An evaluation of the ease of use and administrative burden of the Project Prioritization Process for Proposing Entities.<br \/>\n(b) The [STATE DOT \/ PROJECT SELECTION ENTITY] shall incorporate findings from the retrospective analyses into the revisions to scoring guidelines under Section 5.<br \/>\n(c) The [STATE DOT \/ PROJECT SELECTION ENTITY] and [STATE UNIVERSITY TRANSPORTATION CENTER] shall publish their report and recommendations on a publicly accessible website and submit to the Governor and Legislature by the [START OF SESSION or # DAYS PRIOR TO START].<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section creates a retrospective analysis to be conducted in partnership with a third party, such as a designated University Transportation Center, to evaluate the effectiveness and effects of the state\u2019s project selection and prioritization processes. While not a binding directive, the analysis may include analysis of economic development, travel behavior, environmental, housing, ease of use, and cost savings that can be tied back to the Project Prioritization Process. The report must be published publicly and shared with the Governor and legislature by the start of the session and inform future modifications to the process.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 8. Technical Assistance, Data, Research and Implementation Capacity.<\/strong><\/p>\n<p>(a) For the purposes of increasing the quality of transportation projects across the state, improving access to and quality of state transportation data, the development of objective Performance Measures, and to administer, implement, and facilitate robust participation in the Project Prioritization Process, [$15,000,000] will be made available to the [STATE DOT \/ PROJECT SELECTION ENTITY].<br \/>\n(i) The [Secretary] may coordinate the development of agreements for data sharing between state agencies for the development of tools and resources related to the Project Prioritization Process.<br \/>\n(ii) [The [STATE DOT \/ PROJECT SELECTION ENTITY] may hire directly into vacancies for positions managing the Project Prioritization Process].<br \/>\n(iii) The [STATE DOT \/ PROJECT SELECTION ENTITY] may provide technical assistance to localities and other appropriate entities.<br \/>\n(b) The [STATE DOT \/ PROJECT SELECTION ENTITY] may develop new data standards, sources, or processes for the creation and implementation of Performance Measures related to the Project Prioritization Process.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section dedicates funding for this process. A major driver of success is whether or not the offices in charge of Project Prioritization Processes have sufficient resources to administer them, and sufficient resources to help others in the state access the process. $15,000,000 upfront would cover initial project selection cycles, planning, and tool development costs for the process, and allow for the state to understand what sort of savings the process is delivering through the scoring process. <\/p>\n<p>This section also provides for enhanced flexibility for the state to hire staff for the new process, and encourages the state to provide technical assistance and create new tools and standards needed to implement the Project Prioritization Process.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 9. Rulemaking.<\/strong><\/p>\n<p>The [STATE DOT \/ PROJECT SELECTION ENTITY] may adopt rules, technical guidance, tools, and project submission templates necessary to implement this Act.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section provides the state the power needed to adopt rules, guidance, and other tools needed to implement the Project Prioritization Process.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 10. Severability.<\/strong><\/p>\n<p>If any provision of this Act or its application is held invalid, the remainder of the Act shall not be affected and shall continue in full force and effect.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This is a standard severability clause. If a court invalidates one provision or its application in a particular circumstance, the remaining provisions of the Project Prioritization Process remain in effect wherever they can operate independently.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>Section 11. Effective Date.<\/strong><\/p>\n<p>This Act shall take effect on [January 1, 2027] and apply toward the development of the next [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM] cycle.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section sets the date the Project Prioritization Process becomes live. When making this bill work for your local context, consider when would be an appropriate break point between the current transportation planning cycle and a new process.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>[Optional Appendix A. Quantifying regional interests and preference].<\/strong><\/p>\n<p>Section X. Access Performance Measure<\/p>\n<p>(a) The [STATE DOT \/ PROJECT SELECTION ENTITY] shall adopt a multimodal Performance Measure for Access that accounts for travel time by mode, proximity to key destinations, and connections between modes.<br \/>\n(1) Access shall be calculated using post-construction travel times that account for the changes in travel patterns and land use induced by the added capacity over the period of the Long-Range Transportation Plan, estimated using long-term elasticity factors supported by peer-reviewed literature or a model in which trip-making and land use respond to travel time changes.<br \/>\n(2) The [STATE DOT \/ PROJECT SELECTION ENTITY] shall not adopt Performance Measures utilizing measures of vehicle delay, such as vehicle level of service, or vehicle throughput, that are incorporated within Access measures as a contributing factor to travel time.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section creates an access performance measure. Access is an extremely important part of the project selection process because it helps account for many different co-benefits of transportation investment, but is a relatively newer field of transportation analysis compared to congestion measures that state DOTs may be more familiar with. Implementing an access measure effectively should account for how access is affected by projects across different modes of transportation, how projects are likely to affect land use long term, and align with what the most up-to-date peer-reviewed research has identified as the long-term effects of transportation projects. In order to avoid double counting of congestion measures, a frequent problem in transportation, this section prevents the state from using them when they are included within an access model.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>[Optional Appendix B. Quantifying regional interests and preference].<\/strong><\/p>\n<p>Section X. Accounting for local and regional preference<\/p>\n<p>(a) [In order to account for local preference in project selection, before publication and inclusion in the draft [STATE TRANSPORTATION IMPROVEMENT PROGRAM \/ STATE 5-YEAR CAPITAL PROGRAM], the [STATE DOT \/ PROJECT SELECTION ENTITY] may apply a limited boost to project scores, in accordance with requests from Proposing Entity, to be applied after projects are scored on an objective basis.<br \/>\n(1) The [STATE DOT \/ PROJECT SELECTION ENTITY] shall establish the maximum number of boosts to projects a Proposing Entity may make.<br \/>\n(2) The [STATE DOT \/ PROJECT SELECTION ENTITY] shall allow for boost points to allow for an adjustment of up to [30 percentage points] of a projects\u2019 score, and may decrease the weights of boost points in each cycle.<br \/>\n(3) In order to demonstrate shared regional preference, a Proposing Entity may request a boost to projects they did not submit.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section is designed to create a score-changing process for participants in the Project Prioritization Process to voice local preference for project selection, allowing for them to mildly \u201ctip the scale\u201d toward local priorities. By allowing other entities to contribute boost points to projects they did not submit, this also allows for the voicing of regional consensus over project needs. The politics of public resource distribution will not just go away under a Project Prioritization Process, but where political interests are strong and outweigh interests in selecting the best projects, quantifying politics as scores to influence projects may make the process workable in the state. <\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>[Optional Appendix C. Increasing multimodal flexibility].<\/strong><\/p>\n<p>Section X. Increasing flexibility and reducing transportation program complexity<\/p>\n<p>(a) All projects selected under the Project Prioritization Process shall be considered to serve a [TRANSPORTATION OR HIGHWAY] purpose and shall be exempt from any restrictions in statute on the eligibility of funding associated with the [FUNDING PROGRAM].]<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section is designed to override existing, non-constitutional barriers on what type of projects existing transportation funding sources may be used for. This section can also be tweaked to specifically outline which program the state will use to fund selected projects.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>[Optional Appendix D. Regional Project Selection]<\/strong><\/p>\n<p>Section X. Application to Transportation Improvement Programs<\/p>\n<p>(a) It is the policy of the state to encourage each Metropolitan Planning Organization in the state to adopt a scored Project Prioritization Process that meets the requirements of this Act for the selection of projects included in the development of its Transportation Improvement Program.<br \/>\n(b) A Metropolitan Planning Organization may, subject to approval from the [Secretary and\/or State DOT \/ Project Selection Entity], be eligible for funding under the state\u2019s Project Prioritization Process if the Metropolitan Planning Organization\u2019s prioritization process aligns with the state\u2019s.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section is intended to encourage Metropolitan Planning Organizations, which have an existing project selection responsibility under federal law, to align their project selection process with the state by tying their alignment with the process to state funding.<\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\t<div class=\"section\">\n\t\t\t\t<div><p><strong>[Optional Appendix E. Modernizing state goals]<\/strong><\/p>\n<p>Section X. Modernization of State Goals and Statement on Desired Transportation Outcomes<\/p>\n<p>(a) The States\u2019 Goals, as indicated in [STATE LAW], shall be amended as follows:<br \/>\n(1) The promotion of safety for all road users:<br \/>\n(A) The desired outcome of transportation investments is the elimination of all roadway fatalities and serious injuries;<br \/>\n(2) Ensuring roadway and transit infrastructure state of good repair and transit service quality:<br \/>\n(A) The desired outcome is the [elimination of funding gaps for roadway maintenance and transit operations to ensure fiscal sustainability;<br \/>\n(3) Increasing all people\u2019s access to jobs and services using all transportation modes, and especially affordable ones:<br \/>\n(A) The desired outcome is an increase in affordable access to important destinations;<br \/>\n(4) Prioritizing smart growth and economic agglomeration:<br \/>\n(A) The desired outcome is [a reduction in average distances between residences and destinations and a reduction in miles traveled by cars, while increasing statewide economic growth];<br \/>\n(5) Reducing cancer-causing emissions and emissions harmful to the climate and environment:<br \/>\n(A) The desired outcome is the [substantial reduction\/elimination] of harmful transportation emissions.<br \/>\n(6) Ensuring transparency and accountability for public investments<br \/>\n(A) The desired outcome is to ensure that investments are made in a sound,  understandable way with clear connection to policy goals and reproducible technical and supporting analyses.<\/p>\n<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"anno\"><p>This section is designed to provide a format for restructuring the state\u2019s goals to be more conducive to incorporation in the new Project Prioritization Process, considering that state goals must be operationalized into new performance measures. <\/p>\n<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t<\/div>\n\t<p><a href=\"#\" data-copy-bill>Copy Bill Text<\/a><\/p>\n<\/div>\n\n\n<aside class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"wp-block-group__inner-container\">\n<p><strong>Tips for introducing in your state<\/strong><\/p>\n\n\n\n<p><strong>Lead with transparency and good governance.<\/strong> Project prioritization directs funding towards projects with the most merit. Emphasize that it makes decisions more transparent, delivers better results for travelers, and improves the transportation system in measurable ways.<\/p>\n\n\n\n<p><strong>Explain what the process does and doesn\u2019t do.<\/strong> These processes can only do what they are empowered to do. The effects of project prioritization processes are well-documented in states that have implemented them, and they do not imply a change in overall funding for transportation projects.<\/p>\n\n\n\n<p><strong>Participate in the development of scoring. <\/strong>This bill leaves it to the implementing agency to develop performance measures but asks for input. By <a href=\"https:\/\/t4america.org\/2025\/04\/07\/centering-priorities-a-new-framework-on-project-selection-for-transportation-agencies\/\">learning from existing frameworks<\/a>, being wary of pitfalls (like <a href=\"https:\/\/www.planetizen.com\/blogs\/138045-congestion-costing-reality-check-part-1-congestion-evaluation-best-practices\">relying too heavily on congestion-based indicators<\/a>), and sharing <a href=\"https:\/\/ssti.us\/publications\/Modern-Project-Prioritization-for-Transportation-investments\/\">what other states have adopted<\/a>, you can be an informed and influential voice as the process develops.<\/p>\n\n\n\n<p><strong>Look for support across the aisle. <\/strong>Transparent, data-driven project selection has supporters from across the political spectrum, including those you may disagree on other issues.<\/p>\n\n\n\n<p><strong>Meet the moment. <\/strong>DOTs and transportation agencies across the country are struggling for funding. Incorporating this process in tandem with new funding could ensure that the state is selecting the best projects with any new funding.<\/p>\n\n\n\n<p><strong>Check out the <a href=\"https:\/\/welcomingneighbors.us\/wp-content\/uploads\/Pro-Housing-Messaging-Framework-3-Pager_2_20.pdf\">Pro-Housing Messaging<\/a> Framework<\/strong> to help you craft your messages!<\/p>\n<\/div><\/aside>\n\n\n<div class=\"wp-block-breaker\"><\/div>\n\n\n<h3 class=\"wp-block-heading\">Lessons from other states<\/h3>\n\n\n\n<p>Many states have some form of objective project prioritization, but the level of transparency, quantification within measures, and significance varies between states. Some states do things better than others, but Virginia\u2019s SMART SCALE system is the strongest and most well-developed process, thanks to its relatively strong transparency, data integration, technical assistance provided to applicants, and high staff capacity. A <a href=\"https:\/\/www.sciencedirect.com\/science\/article\/abs\/pii\/S2213624X26002403\">recent independent analysis<\/a> provides a good overview of how these processes play out in these different states.&nbsp;<\/p>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>More Research on Transportation Scorecards<\/summary>\n<ul>\n<li><a href=\"https:\/\/reason.org\/commentary\/how-states-prioritize-needed-transportation-projects-improve-effectiveness-of-spending\/\">How States Can Prioritize Needed Transportation Projects and Improve the Effectiveness of Spending<\/a>, Reason Foundation (2026)<\/li>\n\n\n\n<li><a href=\"https:\/\/www.sciencedirect.com\/science\/article\/abs\/pii\/S2213624X26002403\">Governing Transportation Investment by Score: Performance-Based Project Prioritization in U.S. State Departments of Transportation<\/a>, RKK (Stuart Samberg, 2026)<\/li>\n\n\n\n<li><a href=\"https:\/\/reason.org\/testimony\/texas-should-follow-virginias-lead-on-transportation-project-funding\/\">Texas Should Follow Virginia\u2019s Lead on Transportation Project Funding<\/a>, Reason Foundation (2026)<\/li>\n\n\n\n<li><a href=\"https:\/\/t4america.org\/wp-content\/uploads\/2025\/04\/Policy-Selection-Memo-Final.pdf\">Centering Priorities: Project Selection for Transportation Agencies<\/a>, Transportation for America (2025)<\/li>\n\n\n\n<li><a href=\"https:\/\/rosap.ntl.bts.gov\/view\/dot\/56131\">Modern Project Prioritization for Transportation Investments<\/a>, State Smart Transportation Initiative (2021)<\/li>\n\n\n\n<li><a href=\"https:\/\/wordpress.smartgrowthamerica.org\/wp-content\/uploads\/2024\/08\/Practical-Solutions-Memos_FINAL.pdf#page=39\">Prioritizing Projects Based on Outcomes<\/a>, Smart Growth America (2019)<\/li>\n\n\n\n<li><a href=\"https:\/\/t4america.org\/2018\/07\/19\/choosing-transportation-projects-that-actually-match-our-priorities\/\">Choosing Transportation Projects That Actually Match Our Priorities<\/a>, Transportation for America (2018)<\/li>\n\n\n\n<li><a href=\"https:\/\/web.archive.org\/web\/20220120103605\/https:\/\/smartgrowthamerica.org\/wp-content\/uploads\/2017\/01\/how-and-why-of-measuring-access-to-opportunity.pdf\">The How and Why of Measuring Access to Opportunity<\/a>, Transportation for America (2017)<\/li>\n\n\n\n<li><a href=\"https:\/\/rosap.ntl.bts.gov\/view\/dot\/37483\">Benefit-Cost Analysis for Transportation Planning and Public Policy: Towards Multimodal Demand Modeling<\/a> (2016)<\/li>\n\n\n\n<li><a href=\"https:\/\/smartscale.virginia.gov\/media\/smartscale\/documents\/FY28_TechnicalGuide_acc.pdf\">SMART SCALE Technical Guide, FY28<\/a>, Commonwealth of Virginia<\/li>\n<\/ul>\n<\/details>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Virginia \u2014 enacted 2014<\/strong><\/h5>\n\n\n\n<p>Virginia passed <a href=\"https:\/\/lis.virginia.gov\/bill-details\/20141\/HB2\">House Bill 2<\/a> in 2014, directing the Commonwealth Transportation Board (CTB) to develop and use a prioritization process to select transportation projects, now known as Smart SCALE. By June 2015, the CTB developed the program, and by July 2016 the program was active. Smart SCALE identifies economic development, accessibility, safety, congestion mitigation, environmental quality, and land use coordination as factor areas for evaluation. In 2017, the Office of Intermodal Planning and Investment (OIPI) was created to oversee the program, and in 2020 the transportation funding formula was revised. Smart SCALE requires that project benefits be analyzed relative to the project cost, ensuring final scoring is based on the project cost to the state. Since implementation, even as total available funds may fluctuate, the state\u2019s <a href=\"https:\/\/ssti.us\/2021\/05\/18\/three-steps-toward-smarter-transportation-investments\/\">spending on transit, biking, and walking has increased<\/a> as applicants have grown accustomed to the process and met goals using new strategies for lower costs.&nbsp;<\/p>\n\n\n\n<p>Virginia\u2019s process is mature and well developed, but without reading its <a href=\"https:\/\/smartscale.virginia.gov\/media\/smartscale\/documents\/FY28_TechnicalGuide_acc.pdf\">full technical guide<\/a>, you might struggle to understand how it works. For a quicker summary of how the process works, this formula describes how projects are scored:<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"3594\" height=\"1972\" src=\"https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2.png\" alt=\"\" class=\"wp-image-1889\" style=\"width:837px;height:auto\" srcset=\"https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2.png 3594w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-300x165.png 300w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-700x384.png 700w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-768x421.png 768w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-1536x843.png 1536w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-2048x1124.png 2048w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-2000x1097.png 2000w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-1200x658.png 1200w, https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/SMART-SCALE-scoring-\u2014-simple-infographic@2x-2-120x66.png 120w\" sizes=\"(max-width: 3594px) 100vw, 3594px\" \/><\/figure>\n\n\n\n<ul>\n<li><a href=\"https:\/\/t4america.org\/2016\/06\/14\/virginia-approves-its-first-transportation-plan-based-on-a-new-system-of-scoring-and-prioritizing-projects\/\">Virginia Approves Its First Transportation Plan Based on a New System of Scoring and Prioritizing Projects<\/a>, Transportation for America (2016)<\/li>\n\n\n\n<li><a href=\"https:\/\/www.washingtonpost.com\/local\/robert-mcdonnells-other-big-scandal-bum-deal-on-us-460-project-cost-virginia-plenty\/2014\/10\/11\/ebf08fc6-50be-11e4-babe-e91da079cb8a_story.html\">Robert McDonnell\u2019s Other Big Scandal: Bum Deal on U.S. 460 Project Cost Virginia Plenty<\/a>, The Washington Post (2014)<\/li>\n\n\n\n<li><a href=\"https:\/\/ctb.virginia.gov\/media\/ctb\/agendas-and-meeting-minutes\/2021\/dec\/pres\/17_jlarc.pdf\">JLARC Report on Transportation Infrastructure and Funding<\/a>, Joint Legislative Audit and Review Commission (2021)<\/li>\n\n\n\n<li><a href=\"https:\/\/virginiamercury.com\/2023\/03\/23\/virginia-to-conduct-in-depth-review-of-smart-scale-process\/\">Virginia to Conduct In-Depth Review of SMART SCALE Process<\/a>, Virginia Mercury (2023)<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Utah<\/strong> <strong><strong>\u2014<\/strong><\/strong> <strong>enacted 2019<\/strong><\/h5>\n\n\n\n<p>The Utah Transportation Commission developed and utilizes a prioritization process to guide project-level investments and programming for the Transportation Investment Fund and Transit Transportation Investment Fund. These two programs account for roughly 50% of UDOT spending, both going towards capacity projects. Utah\u2019s process does well when it comes to transparency. There are <a href=\"https:\/\/drive.google.com\/file\/d\/1RAz1RqnScTYZE0-uWS29Js08cUTJdRKE\/view\">four prioritization models<\/a>, one model for each funding program: TIF Highway, TIF Active Transportation, TTIF Transit, and TTIF First &amp; Last Mile. Each model is directly tied to the <a href=\"https:\/\/uvision.utah.gov\/\">Utah Quality of Life framework<\/a>. Utah\u2019s approach clearly and simply connects its methodology, data, project-level scoring, and long-term vision; however, it should be noted that by siloing funding to each mode of transportation, the state may ignore the relative benefits of certain project types to address state goals. For instance, the safety benefits of shifting trips off of dangerous roads to statistically safer modes of transportation would not be effectively measured under Utah\u2019s program.<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Kentucky \u2014 implemented 2017<\/strong><\/h5>\n\n\n\n<p>In 2016, former Governor Matt Bevin directed state transportation leaders to develop a data-driven tool to help prioritize spending of limited transportation dollars. Gov. Bevin and transportation leaders saw that Kentucky was overpromising state dollars for projects; in fact, they <a href=\"https:\/\/apps.legislature.ky.gov\/minutes\/prog_rev\/170511OK.HTM\">only had 10 percent of the $7.1 Billion of projects promised<\/a> with state funds in the Highway Plan. In response, the <a href=\"https:\/\/transportation.ky.gov\/SHIFT\/Pages\/default.aspx\">Strategic Highway Investment Formula for Tomorrow<\/a> (SHIFT) was created as an administrative initiative to provide recommendations for funding to the legislature. Since 2018, SHIFT has been used to develop funding plans, weighing safety, economic growth, cost-benefit, asset management, and congestion as key measures for project selection. However, it is important to note that, ultimately, the <a href=\"https:\/\/kp.uky.edu\/knowledge-portal\/articles\/understanding-the-kytc-budget-and-the-highway-plan\/\">Kentucky General Assembly and Governor have final choice over project selection<\/a>, often in conflict with recommendations developed through SHIFT.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h5 class=\"wp-block-heading\">Issue tags<\/h5>\n\n\n<div class=\"taxonomy-filter_area wp-block-post-terms\"><a href=\"https:\/\/www.metroabundance.org\/filter_area\/transit\/\" rel=\"tag\">Transit<\/a><span class=\"wp-block-post-terms__separator\">, <\/span><a href=\"https:\/\/www.metroabundance.org\/filter_area\/transportation-choices\/\" rel=\"tag\">Transportation Choices<\/a><\/div>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h5 class=\"wp-block-heading\">Related model legislation<\/h5>\n\n\n\n<p><a href=\"https:\/\/www.metroabundance.org\/legislations\/transit-oriented-development\/\">Transit Oriented Development<\/a> \u2022 <a href=\"https:\/\/www.metroabundance.org\/legislations\/parking-mandate-reform\/\">Parking Mandate Reform<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.","protected":false},"featured_media":1883,"template":"single-legislation-model.php","filter_area":[63,56],"filter_government":[],"acf":[],"yoast_head":"<title>Transportation Project Prioritization Reform - Metropolitan Abundance Project<\/title>\n<meta name=\"description\" content=\"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transportation Project Prioritization Reform - Metropolitan Abundance Project\" \/>\n<meta property=\"og:description\" content=\"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/\" \/>\n<meta property=\"og:site_name\" content=\"Metropolitan Abundance Project\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-13T15:06:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/pexels-brett-sayles-8860492-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1279\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/\",\"url\":\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/\",\"name\":\"Transportation Project Prioritization Reform - Metropolitan Abundance Project\",\"isPartOf\":{\"@id\":\"https:\/\/www.metroabundance.org\/#website\"},\"datePublished\":\"2026-11-13T00:08:48+00:00\",\"dateModified\":\"2026-11-13T15:06:49+00:00\",\"description\":\"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.metroabundance.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transportation Project Prioritization Reform\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.metroabundance.org\/#website\",\"url\":\"https:\/\/www.metroabundance.org\/\",\"name\":\"Metropolitan Abundance Project\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.metroabundance.org\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>","yoast_head_json":{"title":"Transportation Project Prioritization Reform - Metropolitan Abundance Project","description":"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/","og_locale":"en_US","og_type":"article","og_title":"Transportation Project Prioritization Reform - Metropolitan Abundance Project","og_description":"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.","og_url":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/","og_site_name":"Metropolitan Abundance Project","article_modified_time":"2026-11-13T15:06:49+00:00","og_image":[{"width":1920,"height":1279,"url":"https:\/\/www.metroabundance.org\/wp-content\/uploads\/2026\/11\/pexels-brett-sayles-8860492-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/","url":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/","name":"Transportation Project Prioritization Reform - Metropolitan Abundance Project","isPartOf":{"@id":"https:\/\/www.metroabundance.org\/#website"},"datePublished":"2026-11-13T00:08:48+00:00","dateModified":"2026-11-13T15:06:49+00:00","description":"Model state legislation for choosing transportation projects through a transparent, scored process that weighs benefits against costs, based on Virginia\u2019s SMART SCALE.","breadcrumb":{"@id":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.metroabundance.org\/legislations\/transportation-scorecard-act\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.metroabundance.org\/"},{"@type":"ListItem","position":2,"name":"Transportation Project Prioritization Reform"}]},{"@type":"WebSite","@id":"https:\/\/www.metroabundance.org\/#website","url":"https:\/\/www.metroabundance.org\/","name":"Metropolitan Abundance Project","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.metroabundance.org\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/legislation\/1876"}],"collection":[{"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/legislation"}],"about":[{"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/types\/legislation"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/media\/1883"}],"wp:attachment":[{"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/media?parent=1876"}],"wp:term":[{"taxonomy":"filter_area","embeddable":true,"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/filter_area?post=1876"},{"taxonomy":"filter_government","embeddable":true,"href":"https:\/\/www.metroabundance.org\/api\/wp\/v2\/filter_government?post=1876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}